Future Road Construction Projects

Print
Press Enter to show all options, press Tab go to next option

WIDENING PROJECTS 

There is a plan for future street widening by year, however it is a plan that can change annually based on funding available from both the local and State level and many other factors. The plan calls for using matching federal funds to widen roads.

EVERY-THREE YEARS PLAN: The plan calls for construction of roads every 3 years with a schedule as follows:

Budget Year Major Street Area Status
2026 N Cleveland Street
Maple Ave to Chestnut Ave Future Project
2023 N Cleveland Street Railroad Tracks to W Willow Rd [PDF]
In Design
2020 N Cleveland Street
W Chestnut Ave to Railroad Tracks
In Construction

 

LONG TERM PLAN: The long term plan proposes the widening of the following:

Budget Year Major Street Area Status
2019-2020 Intersection Garland Rd and Randolph Ave In Design
2019-2020 Garland Road Randolph Ave to Garriott Rd In Design
Future Randolph Avenue Cleveland St to Willow Ave Future
Future Oakwood Road Chestnut Ave to Willow Ave Future

 

MAJOR ARTERIAL STREET OVERLAY PROGRAM

In addition to widening projects there is the major arterial street overlay program every year. The specific projects are identified annually so that information will be available each year, but the major streets in construction, in a future construction, or in design phase are listed below.

Budget Year Major Street Area Status
2018-2019
E Broadway Avenue 16th St to N University Ave In Construction
2018-2019
W Broadway Avenue N Van Buren St to N Washington St Construction Beginning Soon
2019-2020
Randolph Avenue Washington Ave to 7th Street In Design
2019-2020
Randolph Avenue 26th St to 30th St In Design
2019-2020 N University Avenue E Maine St to E Randolph Ave In Design

 

LOCAL STREET RECONSTRUCTION PROJECTS

Also there is the local Street reconstruction projects annually, that are determined based on street conditions and appropriations. Below is a list of Local Street Reconstruction Projects that are either recently completed, currently in construction, in a future construction, or in the design phase for a future construction.

Budget Year Local Street Area Status
2018-2019 W Indiana Ave S Jefferson St to S Adams St Complete
2018-2019 W Harvard Ave Jackson St to N Midway St Complete
2018-2019 N 12th Street E Walnut to E Chestnut In Construction
2018-2019
Kennedy St 
E Ash Ave to E Hemlock Ave
Construction Beginning Soon
2019-2020 W Maple Ave 
N Washington St to N Independence Ave
In Design
2019-2020
W Oklahoma Ave 
S Washington St to S Independence Ave
In Design
2019-2020
E Maple Ave 
N 10th St to N 16th St
In Design

 

 

N. Cleveland Street
N. Cleveland Street
In Design
In Design

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer